How can Enerlogix help my facilities?
How long does the process take to migrate my facilities to the MEM?
Typically, migrating from CFE Basic Service to the MEM takes between 8 to 10 months. An action plan must be put in place to identify all the steps throughout the process. Enerlogix will assist you by scheduling the activities required so that your facilities may transition into the deregulated market.
Is my facility allowed to have both a MEM contract and a Self-Supply contract for one load center at once?
No. Self-Supply and the MEM belong to different regimes and do not co-exist. The same goes for CFE Basic Service and the MEM, either the load center remains a Basic Service User or it migrates to the MEM. In the MEM, the Qualified User will be supplied by a Qualified Service Retailer; this Retailer will represent the load center for all its electricity transactions in the market.
Whatever your current contracted condition, reach out to Enerlogix. Enerlogix will assist by analyzing your current situation and will suggest the best available option.